Our Track Record
Projects delivered across Zambia
From rural grid extension to primary electrical infrastructure for private developers, every project below is drawn from Muchinda's corporate profile and supporting client reference letters.

LIO Energies Project
LIO Energies
Project details to be supplied by Muchinda.
View case study
Rural Electrification Authority — Sakania & Fiwila Grid Extension
Rural Electrification Authority (REA)
Under the government's rural electrification programme, REA awarded Muchinda two Grid Extension Project contracts under the 2018/2019 REA work plan. Both were completed several weeks ahead of schedule.
View case study
Electrification of Sakania District
Ministry of Energy and Water Development, REA and ZESCO Limited
Muchinda was awarded a contract to electrify Sakania and its key community institutions — schools, a clinic and surrounding residences — directly benefiting the Ministry of Energy and Water Development, the Rural Electrification Authority and ZESCO Limited, as well as the local population.
View case study
LIMECO Resources Plant Electrification
LIMECO Resources Limited
Muchinda delivered the primary incoming power infrastructure and internal reticulation for LIMECO Resources' plant, from the ZESCO tie-in through to internal distribution.
View case study
The Urban Hotel — Primary Electrical Infrastructure
Rembrandt Properties Limited
Muchinda was appointed main electrical contractor for The Urban Hotel, delivering primary electrical infrastructure under the supervision of consulting engineers Dexterity System Solutions.
View case study
Goldcrest Properties Developments
Goldcrest Properties Limited
Goldcrest Properties Limited awarded Muchinda the electrical works across several of its developments, coordinated through electrical consultant Mete Banda.
View case study
Lee Yeast Zambia — Plant Installations
Lee Yeast Zambia Limited
Since 2013, Muchinda has run several contracts for Lee Yeast Zambia Limited, including the successful turnkey installation and commissioning of two plants.
View case study
ZESCO Network Construction & Framework Agreement
ZESCO Limited
Muchinda has carried out high-voltage line construction and substation installation works for ZESCO Limited since at least 2014, and is an appointed contractor under ZESCO's 2-year rate-based framework contract (Contract No. ZESCO/SS/008/2023-207) for small-scope distribution network construction, awarded October 2023.
View case study